Search
Close this search box.

Spotify Camp Nou: Expansion and Construction Details 2024

camp_nou 2024

Spotify Camp Nou: Expansion and Construction Details 2024

Finally, the new Spotify Cam Nou is nearing Completion

Spotify Camp Nou: Expansion and Construction Details 2024:

  • Target Capacity: 105,000
  • Capacity Before Works: 99,354
  • Country: Spain
  • City: Barcelona
  • Clubs: FC Barcelona
  • Category: Construction in Progress
  • Construction Period: 2022–2025
  • Cost: €1.07 B ($1.16 B)

Why Upgrade Camp Nou?

Camp Nou, inaugurated on September 24, 1957, initially featured two levels of stands. It was expanded before the 1982 Spanish World Cup with a third tier, and the lower ring was rebuilt between 1993 and 1994, which included lowering the pitch and removing standing areas. Despite minor renovations, the stadium has largely retained this form. As the largest stadium in Europe and home to globally renowned FC Barcelona, the need for further expansion became evident in the early 21st century.

Main Features of the Camp Nou Expansion

  • New Third Tier: Constructing a new third tier with a uniform height, increasing capacity to over 105,000.
  • VIP Ring: Creating a VIP ring between the second and third tiers.
  • Roofing: Roofing all spectator seats.
  • Panoramic Screen: Adding a panoramic screen under the canopy.
  • Open Feel: Enhancing the venue’s open feel with wide terraces.

Costs and Budget

An internal referendum in late 2021 approved a budget of €1.5 billion for the Espai Barça project, with €900 million allocated for Camp Nou. The redevelopment is set for completion between 2022 and 2025.

Initial Works and Sponsorship

Preparatory work began in July 2022, coinciding with a sponsorship agreement that renamed the venue to Spotify Camp Nou. Demolition of the south stand started on September 1, 2022, involving the removal of seats and reinforced concrete elements. This phase was completed by the end of 2022 at a cost of €4.6 million.

Main Construction Phase

The main construction work commenced after the 2022/23 season. Turkish company Limak Construction was announced as the main contractor in early 2023. During the 2023/24 season, FC Barcelona will temporarily relocate to Estadi Olímpic Lluís Companys, which has a capacity of less than 56,000. This move will necessitate many season ticket holders to cancel their tickets.

FC Barcelona aims to return to Camp Nou in the 2024/25 season, though the stadium’s capacity will initially be limited. The full completion of the expansion is scheduled for 2026.

By understanding the details and timeline of the Spotify Camp Nou expansion, fans and stakeholders can anticipate the enhanced experience that awaits upon its completion.

Spotify Camp Nou: Expansion and Construction Details 2024

Mercat de la Boqueria

Investing In El Raval

Post Views: 272 Investing in El Raval I lived in El Raval for a year. Pretty normal during the day,

Related Blogs

Mercat de la Boqueria

Investing In El Raval

Post Views: 272 Investing in El Raval I lived in El Raval for a year. Pretty normal during the day,

The Ultimate Guide to Buying Real Estate in Barcelona

Be prepared for your Barcelona home purchase with our comprehensive guide.
The 2024 Ultimate Guide to Buying Real Estate in Barcelona (2)

Get Your Free Guide Today

80 Pages packed with valuable and informative content!

Receive regular updates and expert tips on the thriving Barcelona property market. Our content is carefully curated to provide you with the best insights and analysis. We never indulge in spam and you can cancel at any time. Stay informed and make the most of your investment with Barcelona Property News.

Please provide as much detail as possible in your message to help us understand your needs better. Such as the number of bedrooms needed, and your approximate viewing or moving time.

Have any Questions?

Contact Us

Submit the form and one of our friendly agents will be in touch with you shortly.

You cannot copy content of this page